If your property sits near a transmission line, substation, or high-voltage corridor, we would love to connect.
Land located near transmission lines, substations, or interconnection points capable of supporting large power loads.
Larger parcels near grid infrastructure are prioritized. Constraints are evaluated for each site to confirm suitability.
Agricultural, industrial, or rural zoning with potential for energy or infrastructure use. Existing industrial use can accelerate permitting.
Sites require access to several key types of infrastructure. We evaluate this for each potential property.
Properties across every market in the U.S. are of interest. Each location is evaluated to confirm the unique market opportunity.
If you think your land might qualify but aren't certain, submit it for evaluation.

We identify locations where there's available electricity capacity. Every site we pursue has a genuine path to power from day one.

We reach out to introduce ourselves, learn about your property, and share what we’re building. If the land is a fit, we prepare an offer. You would keep using your land as you do today during the development period.

We work through the necessary approvals and studies to advance the site. We engage with local authorities early and build a clear, well-structured path forward to bring the project to construction.

Once the project is designed and approved, it moves into construction. Throughout this process, we follow all rules, regulations, and best practices regarding constructing a project. Once complete, it's commissioned and allowed to push energy to the grid.
Every project is different. At all sites, there will be electrical infrastructure like a substation, transmission lines, and switching equipment. Depending on the site’s power capacity, that could be paired with battery storage, renewable generation, or large commercial facilities like a data center. We evaluate each property individually based on grid access and local conditions.
Many of the best transmission-adjacent sites are currently in agricultural use. Contract structures can be designed to allow continued farming or ranching during development evaluation periods, and can be phased to minimize disruption to your operations.
Infrawatt develops sites for utility-scale energy generation and high-capacity industrial power loads "energy parks". The type of project depends on grid conditions, site characteristics, and market demand. We'll discuss the type of project with you upfront.
Infrawatt values sites based multiple variables including their proximity to grid connectivity, permitting complexity, acreage, and the cost certainty they provide to energy developers. This often results in valuations that significantly exceed conventional agricultural or raw land prices. We're transparent about our methodology and encourage you to get independent counsel.